GlobeCore / PRODUCT / Vacuum Transformer Drying Ovens / US-20S Transformer Drying Oven

US-20S Transformer Drying Oven

The US-20S transformer drying oven is designed for thermal vacuum drying of oil-filled transformer components and can be used both for new transformers during manufacturing and for transformer restoration during repair and maintenance.

The unit can also be used for moisture removal from other electromechanical equipment, drying various materials, and curing paint and varnish coatings at a maximum operating temperature of up to 130°C.

The US-20S transformer drying oven also allows a transformer to be filled with transformer oil under vacuum through a dedicated oil filling pipeline.

Temperature Control in the Drying Chamber

The required temperature inside the drying chamber is generated and maintained by installed dual-circuit tubular radiators using oil as the heat-transfer medium, combined with internal air circulation. High-temperature centrifugal fans are used to circulate the heated air throughout the chamber.

To accelerate the drying process and significantly reduce the moisture content in the transformer active part, the transformer drying oven is equipped with a vacuum system. By reducing the pressure inside the drying chamber, the system increases the rate of moisture evaporation and reduces the overall drying time.

A condensation system is provided to collect and remove the moisture extracted during the drying process.

Loading Transformer Components into the Drying Chamber

For loading and unloading transformer components into and out of the drying chamber, the US-20S transformer drying oven is equipped with an internal electrically driven loading/unloading system.

The door can be operated automatically when the automatic operating mode is selected on the controller or manually via the controller when manual mode is selected.

A vacuum-tight seal between the door and the drying chamber is ensured by clamping cylinders. The cylinders press the door firmly against the chamber body through a sealing gasket, maintaining the required airtightness during vacuum operation.

Transformer Drying Oven Operation and Control

The operating status of the US-20S transformer drying oven can be monitored via the controller display installed in the control cabinet.

The US-20S is equipped with a drying process control system based on a programmable logic controller (PLC) with a touchscreen display. The system provides real-time monitoring and control of the drying process according to the preset temperature parameters, as well as continuous monitoring of the vacuum level inside the drying chamber.

No. Parameter Value
Drying Chamber
1 Internal dimensions, mm, min.:
– length 3000
– width 2500
– height 2500
2 Internal volume, m³ 18,75
Heating Unit
3 Heater power, kW 144 (72×2)
4 Temperature control range, °C 20-140
5 Number of heating units, pcs. 2
6 Oil transfer pump capacity per unit, m³/h 4
7 Oil pressure in the system (depending on oil temperature), in normal operating mode, bar 0,5-2,0
8 Oil volume in the system, L 900
Vacuum Unit
9 Capacity, m³/min (m³/h) 35 (2100)
10 Total motor power, kW 14,5
11 Ultimate residual pressure, max., mbar 0,5
Circulation System
12 Capacity, m³/min (m³/h) 26,6 × 4 (1600×4)
13 Fan drive power, kW 1,1×4
Exhaust System
14 Capacity, m³/min (m³/h) 50 (3000)
15 Fan power, kW 2,2
Condensation System
16 Chiller cooling capacity, kW 3,37
17 Chiller cooling capacity at +10°C evaporator outlet temperature, kcal/h 6800
18 Condensation surface area, m² 7,5
19 Heat exchanger (condenser) type Shell-and-tube
Pneumatic System
20 Compressor power, kW 2,2
21 Capacity, m³/min 0,33
22 Pressure, bar 6-10
Air Drying System
23 Dry air capacity, m³/min 2,5
24 Air dryer power in operating mode, kW 5,5
Overall Unit Specifications
25 Weight, max., kg 32,5 ±5%
26 Overall dimensions, mm, max.:
– length 11000
– width 7500
– height 4100

  • Can be used both at transformer manufacturing plants and in transformer repair workshops;
  • More efficient drying compared with hot-air drying;
  • Uniform drying throughout the entire volume of the transformer active part;
  • Allows the transformer to be filled with transformer oil under vacuum through a dedicated oil filling pipeline.

    GlobeCore

    Leave your request

    EN ▾